The challenge
What the client was up against.
Multiple legacy ERPs, 40+ country variants, and an aggressive clean-core mandate from the executive team.
The BNS response
What we built, and how.
BNS led the global program — reference operating model, clean-core configuration, integration fabric and wave-based rollout.
Managed services now run the platform alongside the client team.
Delivery timeline
How the program ran.
- Phase 01
Reference model
Operating model and configuration baseline.
- Phase 02
Pilot wave
Two-country pilot delivered in eight months.
- Phase 03
Global rollout
Six waves across 40 countries with local hypercare.