The challenge
What the client was up against.
A surge of distributed generation and flexible loads required real-time orchestration against volatile markets.
The BNS response
What we built, and how.
BNS delivered a DER orchestration platform and market gateway — with grid code and market compliance as first-class features.
Delivery timeline
How the program ran.
- Phase 01
Architecture
Reference architecture and regulatory alignment.
- Phase 02
Integration
DER onboarding and market gateway.
- Phase 03
Operations
24/7 grid operations handover.